通過式清洗機的工作流程是怎樣的呢?下面
山東超聲波清洗機廠家為您講講這個問題,讓您在使用該設(shè)備的時候不出什么問題。
What is the working process of the pass through cleaner? Next, Shandong ultrasonic cleaning machine manufacturer will tell you about this problem so that you can use this equipment without any problems.
1、檢查清洗液在工作前的濃度和配比,水位是否足夠高。
1. Check the concentration and proportion of cleaning solution before operation and whether the water level is high enough.
2、打開水箱和水泵之間的兩個閘閥。
2. Open the two gate valves between the water tank and the water pump.
3、將洗滌罐和沖洗水箱的電接觸溫度計分別設(shè)置為50~60度。
3. The electric contact thermometers of the washing tank and the washing water tank are set at 50 to 60 degrees, respectively.
4、把電源控制開關(guān)和鑰匙放在打開的位置。
4. Put the power control switch and key in the on position.
5、連接外部蒸汽加熱,調(diào)節(jié)T1和T2溫控表。
5. Connect external steam heating and adjust T1 and T2 temperature control meters.
6、打開加熱器,使其開始自動加熱。
6. Turn on the heater to start automatic heating.
7、打開除油裝置,開始除油,因此水泵不打開,水面平靜,排油效果好。
7. Open the oil removal device to start oil removal. Therefore, the water pump does not open, the water surface is calm, and the oil discharge effect is good.
8、當(dāng)溫度上升到預(yù)定值時,操作者開始工作,操作者根據(jù)需要選擇開關(guān)。根據(jù)每個單動按鈕,進(jìn)行泵、霧、運輸?shù)取?/div>
8. When the temperature rises to a predetermined value, the operator starts to work, and the operator selects the switch as required. Pump, fog, transport, etc. according to each single action button.
當(dāng)機器運行時,操作者可連續(xù)地將輸送帶裝入裝載口,沖洗、漂洗、吹干和輸出,并在卸貨港移除清潔部件。
When the machine is running, the operator can continuously load the conveyor belt into the loading port, wash, rinse, blow dry and output, and remove the cleaning parts at the unloading port.
通過式清洗機認(rèn)真維護(hù)保養(yǎng)是保持設(shè)備良好性能和延長使用壽命的保證。維護(hù)保養(yǎng)分為日常保養(yǎng)和定期維護(hù)保養(yǎng)兩種,日常保養(yǎng)的內(nèi)容有:
Careful maintenance of the through type cleaning machine is the guarantee to maintain the good performance of the equipment and prolong the service life. Maintenance is divided into daily maintenance and regular maintenance. The contents of daily maintenance include:
開機前要檢查潤滑油是否充足,要檢查各個連接零部件是否連接緊密,要檢查過濾網(wǎng)是否干凈等。高壓清洗任務(wù)完成后,要排放干凈機器設(shè)備內(nèi)的殘留水,擦拭干凈機器,收納好進(jìn)水管和出水管,把設(shè)備放置在通風(fēng)干燥的地方。
Before startup, check whether the lubricating oil is sufficient, whether the connecting parts are tightly connected, and whether the filter screen is clean. After the high-pressure cleaning task is completed, the residual water in the machine and equipment shall be drained, the machine shall be wiped, the water inlet and outlet pipes shall be stored, and the equipment shall be placed in a ventilated and dry place.
通過式清洗機還要定期維護(hù)保養(yǎng),定期更換機油,通常在運轉(zhuǎn)200小時后,更換新的機油,防止舊機油潤滑效果差磨損機器。定期檢查密封圈是否老化,及時更換新的密封圈,保持設(shè)備良好的密封性。
The through type cleaning machine shall also be regularly maintained and the engine oil shall be replaced regularly. Usually, after 200 hours of operation, the new engine oil shall be replaced to prevent the old engine oil from wearing the machine with poor lubrication effect. Regularly check whether the sealing ring is aging, and replace the new sealing ring in time to maintain good sealing performance of the equipment.
正確操作使用才能防止故障,長期保持良好性能,發(fā)揮設(shè)備的作用。所以以上的工作流程等內(nèi)容要充分了解到才,更多事項就來我們網(wǎng)站
www.rllrhm.com咨詢吧。
Correct operation and use can prevent failure, maintain good performance for a long time, and play the role of the equipment. Therefore, you should fully understand the above workflow and other contents. For more information, please visit our website www.rllrhm.com.
- 公司:濟南科爾超聲波設(shè)備有限公司
- 熱線:18663767799
- 地址:山東省濟南市濟陽區(qū)創(chuàng)業(yè)路與啟航街交叉口南40米